We have been making great progress on the bunkers and possibly in a week we will have the gravel sprayed and ready for sand soon after that, weather dependent. The 13th right side bunker has gravel and they are finishing the final prep on the left side bunker. They then are relocating to #12 green complex where the excavating of the sand is taking place. Once 12 and 13 are completed we will be moving to #14 fairway bunkers. These bunkers we anticipate to go very smoothly with minimal shaping that needs to be done.
|
13 right side bunker |
|
13 left side bunker, new nose addition |
|
Same bunker that has been moved closer to the green. |
|
#12 front bunker, sand removal. |
|
#12 front bunker getting close to final prep. |
|
This area we are stock piling our soil. |
The next long term winter project has started on #10 fairway. We are raising and leving heads that have become low because of the fairway top dressing program that we have implemented.
|
Safety net so my staff can keep working uninterrupted by
play, this is a long process and every minute we
have is valuable. |
|
This head has been raised and ready for sod. |
|
This is precisely the look we want. |