We have finally reached the day that the old bunkers and the problems that were associated with them will be behind us. The construction crew moved into action and started to dismantle the fairway bunker on #12 and the bunker complexes on #13. We are already finding things that have caused us a lot of problems one which we already know of was that the bunkers were not deep enough and the second is the drainage install was not up to the standards that it should of been. I am sure we will see more things down the road that will surprise us. In the end it is a very exciting time and when next season rolls around this will be a proud moment for all of us. I will post a lot of pictures almost daily on the progress as it happens.
We have also begun to top dress fairways, we started on #12 and #13 and will be moving forward.
|
They first reclaim and reshape the edges by hand. |
|
The mini excavator scraping out the old sand. |
|
Sand Removal |
|
Popping the old drainage out to be partially reused. |
|
Removing the bottom of the bunker.. |
|
12 Fairway Bunker getting a little deeper |
|
13 left side bunker getting a face lift. |
|
13 right side bunker holding water in the drain line, hmmm. |
|
Back Bunker on 13 is being filled in, stay tuned for what
we do to enhance it! |
|
Solid tining so they will accept the sand. |
|
Top Dressing the fairway. |