Showing posts with label curbing. Show all posts
Showing posts with label curbing. Show all posts

Tuesday, January 30, 2018

Winter Project Update

Winter projects are moving right along this year. Over the past winters we have performed our spring greens aerification during the winter. We have experimented with different techniques so we can achieve our USGA recommended 20% surface disruption. During this time we exercise the most disruption allowing us to achieve our goals. This is very important during this time, our member play is down and we do close the greens for these agronomic programs.  This year we opted to target the top 1 inch of the green surface. We regularly test the top 4 inches and our test concluded we needed to be target the top. We used a machine that slices a 1 inch deep line and then is filled with sand right behind the unit. This is a wonderful way to have firm and fast greens during the summer months. For our second program, we will use our deep tine machine that will poke a hole 12 inches deep. We then will drop a line of sand and manually broom into the holes. This will help with drainage and increase the rooting on the greens. Once the deep tine program is complete (fingers crossed by next week), we will cover the greens until sometime in mid-March.

Other notable Projects:

  • Golf Course wide tree pruning. This will increase sight lines, shade mitigation and improve air flow. 
  • Curbs have been installed on 3 green, 4 green 5 green, 18 green, 9 green, and 10 tee along the cart path edge. This will cut down on wear and the staff having to repair every year. 
  • Fairways have been verti-cut, aerified, and top dressed and currently we are finishing up the deep tine.
  • Rough has been aerified
  • The rough around #5 green has been replaced with new sod.
  • Our new tee on #17 is coming along nicely and we hope to have this completed by March. 


The Graden Machine in Action

Pushing off left over debris

Deep tine machine going 12 inches deep

Sand ready to be pushed into the holes 

Finished product
#18 green side curb addition

#10 Tee curb addition




Monday, December 5, 2016

December Golf Course Update

Last week we received almost two inches of much needed rain and has helped to recharge the soil profile going into the winter. This has also put a damper on some of our projects that have already started.


  • New tee on #18 is delayed until we can work the soil, this tee will lengthen the white tee markers close to 30 yards. 

  • Golf course leaf clean up is slowly coming to an end.
  • Fairway Deep tine is complete and we are currently using the deep tine machine on the tees.

  • Curb install is on going, we are currently installing behind one green. We also will be raising the drain basin up. Our goal with raising this area up us to facilitate an easier walk to the green and reduce the wear and tear the turfgrass receives. The white outline is our working area and will be the tie in point when all complete. 




  • Our most notable project started today, we have contracted out Mid-Atlantic Dryject services to inject sand into our upper profile of the greens. As you can see from the photos, this is a gentle process to the surface of the but underneath you can see the results. This is just another process to help us reduce our organic matter in the upper surface of the green. The results will pay dividends during the summer. Tuesdays forecast includes rain, and on Wednesday we will finish up the few remaining greens.