Even with the cold temperatures and snow occasionally we have been moving right along. At this point we are in a rather large drainage project on hole #2. This approach has been notoriously wet every year and it eventually drains, turning the cart path into a muck fest. This scenario could not go on any longer and we are confident that not only you will see a drastic improvement to how the approach plays but also limiting the amount of damage we receive on the cart path edge.  
You can actually see the standing water

The cart path edge that would remain wet.

Here you can see how we had to go under the path.
The pavers will be removed and concrete installed for a larger radius,

Sod removed and ready for trenching


Working our way through each new line removing the soil