Friday, December 16, 2011

#8 Bathroom Project

Our other project taking place is the bathroom on #8 has been getting a small make over. The problem that we have been running into is typically we would have to shut down the bathroom in November to winterize the pipes. The building was not equipped with any kind of heat nor insulation. We have torn down the siding and insulated all four walls as well as move the pipes from inside the wall to the interior part of the back wall. I discovered some structural issues in the front over hang that we will be moving to help distribute the load. This will be replaced with heavy beams and give it a better appearance. We are proud that all of this work is being done in house.

Before

After