Last week we started to re-align the tees that have gotten out of square and edges that have been contaminated with bent-grass from divots. As you can see in the photos not a hard process but a meticulous one because the sod will never lie when it comes to two different grasses meeting creating a straight line. We hope to be done with the front 9 this week.
Our second major project is the shifting of the greens loop on #8 green. Currently we have two heads that are in the middle of the green approach about 4 feet from the green. In order to install this properly virtually the entire irrigation pipe has to be hand dug where we will lift and move the pipe and re-set all of the heads around the green. This will insure that our irrigation coverage will not be compromised.