1.
Deep Tine to a depth of at least 8 inches.
2.
Second the 648's pull a core at a depth of 1.5 inches
3.
The crew pushes off the material
4.
The green gets rolled
5.
The Green receives amendments as per the soil tests
6.
We top dress to fill all holes with clean sand
7.
Drag in the sand to fill the holes
8.
Finished Product with all holes filled
9.
Water in!
This would conclude one green and we will continue this process 20 more times. Also the rough is being aerified and a picture follows.
Rough