Friday, February 21, 2014

Pump Station Update

The project has been moving right along and we now have walls surrounding the structure. At some point our roof trusses will arrive and those will be attached and the roof put on. When that is complete the next step is to align the station to mate up with our existing pipes. Because we asked for a larger gallons per minute pump station we need to increase our out going pipe size from 10 inch to 12 inch. This will accommodate any future irrigation additions in the future. 

The snow is melting but much slower than anticipated, this has a lot to do with the recent cold temperature well below 32 degrees causing the ice to become frozen solid with very little air mixed in. With the rain expected today the course is going to be a swamp fest and will need some time to dry out. We are hopeful that the bunker project will pick back up again next week. Thursday we had a sod truck delivered and the staff is busy clearing off the snow around some of the bunkers and placing either tall fescue or bent grass in the required areas. Another group is prepping the shop floor for a coat of paint today.












Tuesday, February 18, 2014

New Pump Station

Yesterday we took delivery of our new pump station and we could not be more thrilled to see that show up. Some might be aware that our old system was well over 20 years old and in bad shape. We were constantly having either pump failures, leaks and inefficient use of our electricity. We had a deadline to start this work and we were not going to let the snow slow us down, so far everything is going to plan, stay tuned on the progress. 

Started with clearing the snow across the 18th fairway
towards the pump house on #10, yes all by hand.

Off loading the station

New discharge "Z" pipe

Making the trek to the pump house

You gotta take it apart, out with old and in with the new.

Our old pump station we are replacing.

Roof removal.

Old station removed.

Walls are gone, new ones to be built later.

Moving in the new station.

Just about the final resting spot.
Stay tuned for more updates.












Friday, February 14, 2014

Course Update

It is no surprise that the recent snow storm that dumped over a foot in our area has slowed our bunker project down. I can say that they did a great job of working over this past weekend to Wednesday to almost having #8 complete with the gravel install and partial #7 fairway bunker. We also have started our annual painting of the shop floor again and we keep trying different coatings to see which one will hold up best for the traffic. Our second phase of tree plantings is under way and this will take us a little longer as compared to the first phase. They are being very careful using mats to get to the area with out disrupting the grass or creating ruts from the heavy weight.

#9 right fairway bunker

#9 back green side bunker

#9 right green side bunker

#8 shaping the front green side bunker

#7 fairway bunker

#8 right side fairway bunkers, small pot bunker has been
filled in.

Tree company slowly making there way to #3,
one mat at a time.

Approximately 15 Trees will go in on the left side to
screen the homes on #3 Tee box.

This is the mechanics office complete, next week we will
work the bathrooms and then the main bay.














Saturday, February 8, 2014

Course Update and Golf Industry Show

This past week I attended the Golf Industry Show where I sought out education on specific subjects as well as see what new things that are being unveiled. In the next few paragraphs I will discuss the classes that I attended and what benefits we can see from using that information on the golf course.

My first initial class that I attended was called High Performance Golf Course Management, this class gave more insight on hiring and training so you can have an effective staff. Some examples were properly interviewing techniques and creating a strong hiring process with strict followed procedures. Other topics that were stressed were employee training and its importance, developing standards for the golf course and emphasizing that planning is very important in achieving your goals. Plan your work and work your plan.

After that class I hustled over to Selection, Establishment and Maintenance of Grasses for Native Roughs and other Reduced Maintenance Areas, we discussed a number of different native grasses that could be used in specific parts of the United States and what the benefits that you could see other than aesthetics. We also covered establishment and timing techniques to properly grow in and yes maintain these areas. Although native these areas would require some kind of maintenance to keep out invasive and exotic species and they are not maintenance free.

The next morning I prepared myself for Zero Waste Golf - A Low-Cost Model to improve Your Facility, We talked about ways that we could save energy through the use of LED lights, something that we have been doing at the shop for the past two years and our club house just this year. The importance of utilizing equipment through the highest efficiency possible, one example is switching all electric motors whether they power HVAC or our irrigation pump house to VFD. We do have a new pump station slated for install this month. What VFD stands for is variable frequency drive, and what this does is instead of using a fixed speed system, VFD will vary its speed according to the demands that are needed there by reducing electricity needed.  Other topics discussed were producing your own compost through discarded food and finding rebates in your state.

Next class, Preparing for and Managing Turf through Water Shortages and Drought,  this topic is more and more discussed as water is becoming increasingly scarce in certain parts of the world as recent news headlines have stated what California could be facing. Topics discussed were ways to communicate the effects of the drought to the membership that brown is okay and lush and green could be a thing of the past in some areas, using wetting agents to make water wetter or move into the soil profile more efficiently and developing emergency action plans if the government demanded water restrictions.

Finally as my week came to a close I had two more classes to take, The impact of your Spray Tank Water on Pesticide Performance, in a nut shell pH can be a contributed factor for reduced efficacy of certain plant protectants and generally having your water tested on a regular basis so that hardness and other contributing factors keep the plant protectants working properly. The last class, Fundamentals of Foliar Fertilization discussed the movement of nutrients into the turf grass plant via foliar applications. A good example is a granular product that is broad cast applied to the soil and eventually taken up through the roots while foliar applications is spraying the nutrients onto the plant to be taken up through the leaves and roots if lightly watered in. This way can more efficient at times by applying light amounts on a regular basis.


During the week of my absence the staff was busy installing trees to screen the fence on 18, picking up limbs on the course from the recent ice storm and preparing our wash pad to meet the Audubon standards that we have achieved recently. They also took the time to organize the shop on inclement weather days and continued to work on their selected projects. Our bunker renovation was held up again but at the end of the week they picked up again working on #8. The question that I have been asked is will this be ready by April 1st?  Honestly its just a little early to predict that, but we are hopeful if we can get a good two week stretch with out weather related delays this could put us back on track.


wash pad prepping